Turbine Starter/Fuel Controller Pad Main and Side tank
Turbine Charging Circuit Planetary Reduction Drive

After many months of preparing the Aircraft body... Main transmission upgrades, Tail Rotor Upgrades, Cones Upgrades and airframe modifications, we are finally ready to start reassembly of the aircraft.

This is a sample of the photos' from the builders log.


Adding new cyclic inspection panel for remote circuit breakers to replace the fuses behind the instrument panel, 12 and 24 volt electrical busses, moving the fuel selector switch to the right side fire wall are all elements for a turbine upgrade.

Adding a new main fuel tank and checking the main fuel tank for fit and installing strut savers in the aircraft legs are part of the upgrades necessary for a turbine conversion.
